# Rainbow Rare Earths (RBW · LSE) - Curation

> Rainbow Rare Earths: A Sustainable, Low-Cost Solution to Meet Growing Global Demand for Critical Rare Earth Elements

- Full showcase: https://ai.curationcorp.com/showcase/Rainbow-Rare-Earths-90903
- Tags: Energy & Materials, LSE, EUROPE, Micro
- Last updated: 2026-11-10

## Overview

Rainbow Rare Earths is pioneering the commercial extraction of rare earth elements (REEs) from phosphogypsum, an industrial byproduct of phosphoric acid production. Its flagship Phalaborwa project in South Africa uses an innovative, hydrometallurgical process to produce separated rare earth oxides (REOs), including key magnet materials Nd, Pr, Dy, and Tb. Recently, Rainbow has expanded its footprint with the Uberaba project in Brazil, where it is collaborating with Mosaic to assess the economic potential of recovering REEs from phosphogypsum at a much larger scale than Phalaborwa. Backed by US government funding and strategic partnerships, Rainbow is transforming legacy waste into critical green technology inputs. The investment case is rooted in Rainbow’s unique technical advantage, low-cost operation, and strong ESG profile. With a scalable model that extends to Uberaba, the company is progressing towards first production in 2029 and offers exposure to one of the few Western-controlled sources of heavy rare earths.

## Bull case

- **A Critical Link in the Electrification and Technology Chain:** Supplies essential rare earths for EVs, wind, robotics, drones, and defense — all megatrends driving global demand growth.
- **Unique Tech That Rewrites Rare Earth Economics:** Recovers rare earths from fertiliser waste, skipping the mining and crushing stages a conventional project needs.
- **Strategic ESG and Geopolitical Relevance:** Western governments want rare earth supply outside China, and this cleans up waste while producing it.

## Bear case

- **Commercial Scale-Up Risk:** Scaling from pilot to commercial could face engineering, integration, or recovery yield issues that impact timelines and economics.
- **Permitting and Regulatory Uncertainty:** Delays in environmental permitting or changes to South African policy may disrupt progress toward financing and construction.
- **More Money Needed Before Anything Is Built:** The company earns nothing and says it must raise further funds before the end of 2027.

## Key risks

- **Commercial Scale-Up Risk:** Moving from laboratory and pilot work to a full commercial plant remains the biggest execution risk. The company says three quarters of the Phalaborwa flow sheet is fixed, which leaves a quarter that is not, and it has already had to change its separation method once after test work with an earlier partner fell short. Bringing the pilot circuit together took longer than expected. A feasibility study still has to confirm the process works reliably, at the right cost, and at product quality customers accept.
- **Permitting and Regulatory Uncertainty:** Phalaborwa still needs key environmental and operating approvals before construction can begin, and the company calls permitting a critical path item for the project. Permitting work was paused and is being restarted alongside the feasibility study, with a newly hired environmental manager leading it. South Africa has a well-established timeline for these approvals, but the clock is not in Rainbow’s hands, and slippage pushes financing and construction back with it.
- **More Money Needed Before Anything Is Built:** Rainbow sells nothing and funds itself by issuing shares, so every stage of work is paid for out of money raised from investors. The board states that the group will need to raise additional funds before 31 December 2027 under all its scenarios, and that this need is a material uncertainty which may cast significant doubt on its ability to continue as a going concern. Raising on poor terms, or not at all, would stall the project and dilute existing holders.

## Catalysts

- Pre-Feasibility Study : Rainbow is targeting publication of a Pre-Feasibility Study on Phalaborwa in Q4 2026, an interim set of economics that would define the products, processes and waste streams well enough to start financing talks and restart permitting. Neo Test Work : Bench and pilot separation test work is under way at Neo Performance Materials' facility in Estonia, using high-grade solution from Phalaborwa. Success would validate the final step in the process before it is built in Johannesburg. Neo Binding Agreements : The technical partnership and long-term offtake arrangement with Neo are subject to finalising binding agreements. Signing them would give Phalaborwa its first named commercial home for the finished material. Uberaba Pre-Feasibility : The Uberaba pre-feasibility study with Mosaic started in September 2026. Its findings would test whether the economics indicated by the earlier assessment hold up under closer work.
- Definitive Feasibility Study : Rainbow expects the full engineering study on Phalaborwa in H1 2027, underpinned by an integrated separation pilot in its own laboratory. It is the study lenders would normally want before committing construction money. Environmental Permitting Completion : Winning the main approvals remains one of the biggest medium-term steps, because it would move Phalaborwa closer to financing and construction. This is one of the clearest markers that the project is moving from study stage toward build stage. Project Funding : The company states it will need to raise further money, expected around Q3 2027. Securing it, and separately the larger package to build Phalaborwa, would show outside capital is ready to back the project. US Listing Decision : Rainbow says it continues to evaluate a potential US listing to reach a wider pool of investors. No budget has been finalised, and the company expects most of the cost to come out of any associated fundraising.
- Phalaborwa Construction : Building and commissioning the plant would turn Rainbow from a developer into a producer. The company's downside funding case allows for early engineering, operational readiness and site works in the second half of 2027, ahead of construction. Uberaba Development : Brazil is the test of whether the chemistry travels. Taking Uberaba beyond pre-feasibility with Mosaic would show the waste-to-value model can be repeated on a larger site outside South Africa.

## Highlights

- **Strategic ESG and Geopolitical Relevance:** Rainbow’s process turns industrial waste into a potential source of strategic materials, which gives the story both environmental and geopolitical relevance. Western governments have moved from talking about rare earth supply to acting on it, through price floor mechanisms, strategic stockpiles and direct investment in supply chains, all of which the company points to as strengthening the case for sources outside China. Its partnership with Mosaic in Brazil, and strategic investors including the trading house Traxys, tie it to that Western supply chain. Phalaborwa also aims to clean up a legacy waste site while recovering the metals.
- **A Critical Link in the Electrification and Technology Chain:** Rare earths are vital for electric vehicles, wind turbines, electronics and defence systems, and Western buyers are now paying noticeably more than buyers inside China for the heavy varieties, a gap the company attributes to tightened Chinese export controls. Phalaborwa is designed to produce neodymium and praseodymium oxide, used in magnets, alongside a carbonate containing dysprosium, terbium and yttrium, the heavier metals that are hardest to source outside China. Uberaba strengthens the story further, giving Rainbow a second project with the potential to repeat the same waste-to-value model at a larger scale.
- **Unique Tech That Rewrites Rare Earth Economics:** Rainbow’s core innovation recovers rare earths from industrial waste, turning a legacy problem into a potential source of valuable materials without the cost of traditional mining. Building its own laboratory in Johannesburg, rather than queuing for outside test work, let the company run far more experiments and settle the chemistry faster; it reports 75% of the Phalaborwa flow sheet now fixed and ready for engineering. For the final separation step it has chosen solvent extraction, the global industry standard, with Neo Performance Materials as technical partner. The same know-how carried straight across to Uberaba, which is what makes the model repeatable.

## Frequently asked questions

### Is Rainbow’s IP protected and monetizable?

Rainbow has not yet patented its flowsheet due to concerns about disclosing proprietary techniques. Instead, its competitive edge lies in execution speed and process know-how developed in-house over four years. Management compares this to the first-mover advantage of Uber or Tesla. Monetization will likely come through global partnerships or licensing deals with operators in Canada, India, and Saudi Arabia who lack similar capabilities.

### What is Rainbow’s process of REE extraction?

The process starts with phosphogypsum, the waste left behind when fertiliser makers produce phosphoric acid, which already contains rare earths and needs no mining or crushing. Chemicals dissolve the metals out of the waste into a concentrated solution. The final step, splitting that mixture into individual products, was originally planned using continuous ion chromatography, but test work with that partner fell short and Rainbow has switched to solvent extraction, the method used across the industry worldwide. Neo Performance Materials is its technical partner for that step.

### Will Rainbow secure commercial-grade offtake agreements?

Rainbow has signed its first offtake MoU (Memorandum of Understanding), with Neo Performance Materials committing to offtake from Phalaborwa in exchange for technical support on the final separation circuit. Rainbow remains in talks with OEMs (Original Equipment Manufacturers) in EVs (Electric Vehicles), wind, and defense, where meeting customer specs remains key to converting discussions into binding contracts. The strategic importance of Dy (Dysprosium) and Tb (Terbium) also means buyers may commit early to secure access. A successful DFS (Definitive Feasibility Study) and demonstration of product quality will likely be the tipping point for offtake signatures.

### How will Rainbow fund construction while avoiding dilution?

Rainbow funds itself by issuing new shares, which means existing holders are diluted each time it raises, and it has done so repeatedly, most recently through a placing that brought in strategic investors alongside existing shareholders. The board states plainly that further money will be needed before the end of 2027 under every scenario it has modelled, and that this is a material uncertainty over the company's ability to keep going. Management says it keeps corporate overheads low so that money raised goes into the two projects rather than the head office.

### How does Uberaba fit into Rainbow’s long-term strategy?

Uberaba is Rainbow's big second opportunity. Working with its partner Mosaic under a signed joint development agreement, Rainbow wants to repeat what it is doing at Phalaborwa but on a far bigger scale, treating leftover fertiliser waste at one of the largest such sites in Brazil. An early economic assessment pointed to attractive returns, and the two partners started a pre-feasibility study in September 2026, the next level of detail. Rainbow describes it as the first use of its extraction know-how beyond its own first project, which is what would show the model travels.